澄彩 DAPPER PACK

How we work

Everything a box needs, under one roof

Structural drawing, printing, foiling, embossing, laminating and gluing happen in our own workshop in Tangxia, Dongguan. That is the reason a 500-unit order is workable: nothing is passed to a second supplier with a minimum of its own.

01 — Structure

The dieline comes first

A box is decided by its drawing, not by its artwork. We draw the structure from your product, so the fit is settled before anyone talks about print.

Drawn from your product

Give us the product dimensions — a bottle, a jar, a folded garment, a candle — and we build the dieline around it, including the headspace and clearance it needs.

Or refined from yours

Already have a dieline? Send it and we will work from it, or adjust the structure where it fights the board or the packing line.

At no charge

Structural design and the dieline are free of charge, before you commit to a production run.

02 — Print & finish

Print, then make the surface do the work

Spot colour, matched to your reference

Send the reference you already work to — a printed sample, a swatch, a colour code — and we match the ink to it. Four-colour process printing for photographic artwork.

Foil, emboss, spot UV

Metallic and coloured foils, raised or debossed relief, and gloss highlights over a matt base. These are the three finishes that most change how a box feels in the hand.

Six laminations

Matt, gloss, soft-touch, anti-scratch, plastic-free and starlight — chosen against the artwork and how the box will be handled.

Recyclable board options

Where the product allows it, we will quote board and laminations that keep the pack recyclable — and tell you when a finish would work against that.

03 — Before production

Nothing goes on the press unapproved

  1. Dieline proof

    You see the structure and the dimensions first, and we change it until the fit is right.

  2. Sample

    Typically 7–10 days, free of charge, with the courier on your account. Special materials and finishes can take longer.

  3. Your approval

    Structure, artwork, board and finish are signed off together — in writing, before the run starts.

  4. Production

    Printed, finished, glued and packed. Schedule and shipping terms were agreed with the quote, so there is nothing left to negotiate at the end.

Line drawing of an open rigid gift box fitted with a die-cut tray holding two round wells.
A rigid box with a die-cut tray — structure and fitment drawn together.

04 — Where it is made

Dongguan Longyuanchang Packaging Co., Ltd.

Our own workshop, west of the Pearl River delta in Guangdong. You are dealing with the people who make the boxes — not an intermediary passing a specification along.

Dongguan Longyuanchang Packaging Co., Ltd.
东莞隆远昌包装有限公司
Bldg 3, 1–2F, Yumingxin Industrial Park,
Tangxia, Dongguan, Guangdong, China

Visiting Dongguan, or want to see the workshop before a first order? Ask us to arrange a walkthrough.

05 — Pricing

Why there is no price list

A box price moves with the board, the size of the run and the finishing — the same carton in matt and in soft-touch foil are two different jobs. So every quote is built from the dieline.

  • Send: product dimensions, quantity, finishing you have in mind.
  • Get back: the quote and the dieline, within one working day.
  • Then: a sample, typically in 7–10 days, before you commit to a run.

Start a quote →

What a quote covers

Included, and charged on top

Not knowing what else will appear on the invoice stops more first orders than the price itself. So here is the boundary before you ask.

Included

  • Structural design and the dieline — at no charge.
  • Printing and finishing to the specification we agree in writing.
  • Gluing, and packing the boxes for shipment.
  • The sample itself — free of charge.

Charged separately

  • Tooling and plate charges, where a job needs them — listed as their own lines on the quote.
  • Courier for samples — on your account.
  • Freight — the shipping term is agreed with the quote.
Nothing else is added quietly. If something would change the price after the quote — a board change, a different finish, a bigger run — you hear about it before it happens, not on the invoice.

Talk to us

Questions about a structure are free

Ask before you have artwork, before you have a quantity, before you know which box you need. A dimension and a rough idea is enough to start.